Adverse Weather conditions can often have a negative impact on construction time schedules. The WACO 600 roofing system designed by ALFIX – allows you to work continuously & efficiently regardless of weather conditions. In comparison to conventional roofing systems, up to 50% of the assembly can be saved with the lightweight, flexible, modular structure.
As KDK Scaffolding are the sole suppliers of the ALFIX scaffolding system in Ireland, we were delighted to be able to utilize this roof design on Trinity Business School in Co. Dublin, the project on Trinity Business School commenced in December 2017, in February 2018 the previously assembled modular structure was lifted into position. It was placed on Vario Rolling frames and enclosed by a Keder Tarpaulin Cover to allow for the restoration/renovation of the building.